Close the Data Center Infrastructure Gap
The gap is the difference between what the campus requires and what the site can provide on the required schedule.
Decision Framework
What a project team should evaluate
01
Power gap
Required facility MW minus dependable capacity available when the project needs it.
02
Time gap
Target operational date compared with credible utility energization.
03
Water gap
Required water profile compared with dependable, acceptable supply.
04
Resiliency gap
Required availability compared with the failure modes and dependencies of existing infrastructure.
05
GTG assessment
Bring the site, load, water demand, utility status and target date. GTG frames the gaps before recommending a technology path.