GTG Data Center Knowledge Center
Onsite Data Center Power Generation
Move the discussion from a generator purchase to a complete operating architecture.
Decision Framework
What a project team should evaluate
01
Size the facility, not just IT load
Cooling, pumps, controls and balance-of-plant loads belong in the power requirement.
02
Choose the grid relationship
Onsite power can be primary, bridge, islandable or hybrid; each changes controls, protection and commercial assumptions.
03
Design maintenance into capacity
Nameplate MW is not enough. Planned maintenance and component failures must be reflected in the architecture.
04
Evaluate fuel resilience
Pipeline capacity, delivered-fuel options and fuel interruption scenarios should be part of diligence.
05
Integrate power with cooling and water
Electrical and thermal infrastructure should be evaluated together for high-density campuses.