Decision Framework

What a project team should evaluate

01

Concentrated loads change the site

Large AI loads can exceed available utility capacity or arrive faster than grid upgrades.

02

Power and cooling are coupled

Higher rack density changes electrical, thermal and potentially water requirements.

03

Build a phased infrastructure path

Capacity can be evaluated around actual deployment stages while preserving future utility integration where appropriate.

04

Set resilience targets early

N+1/N+2 philosophy, maintenance and failure domains should be defined before technology selection.

05

Assess the full infrastructure gap

GTG starts with MW, water, utility status, target date and resiliency requirements.

Bring GTG the site, load and target date.

We use MW requirement, water demand, utility status, resiliency requirements and project schedule to frame a project-specific infrastructure conversation.